Zhongzheng Boiler Group is a manufacturer of industrial steam boiler and hot water boiler
Zhengzhong Boiler Group, founded in 1988, is a joint-stock enterprise with A1, A2, C3 boiler and pressure vessel design and manufacture license permits. 32 years’ experience in boiler and pressure vessel design and manufacturing has rewarded us with an industrial boiler(oil & gas fired boiler, coal fired boiler ,chain grate boiler, circulating fluidized bed boiler, waste heat boiler) production line. As the company continues to grow, many honors have followed us. Now the company has covered an area of 120,000 square meters, with more than 500 employees and more than 200 various types of manufacturing equipments, and ten large research bases.
Why choose us?
ZOZEN has built six fully automatic lines for the production of convection pipe, coil pipe, threaded pipe, membrane wall, serpentine tube and header. The parts so produced have consistent dimensions that enable easy assembly and ten years’ extension of a boiler’s life.
- 1. Convection pipe production line: high precision of ±0.5MM.
- 2. Coil pipe production line: three pieces of pipes can be coiled at the same time. 114mm diameter pipes are coiled into 4.5 meters coil.
- 3. Threaded smoke pipe production line: tread depth is accurately measured by infrared radiation to ensure tread depth is proper.
- 4. Membrane wall production line: MPM automatic welding machine with 12 heads, 1600MM panel bending machine.
- 5. Serpentine tube production line: 150 meters pipe can be made into economizer or super heater in one time without manual seam.
- 6. Header production line: by medium frequency electric heating, mechanical flow forming closing and NC drilling.
Seven hold points are set and each one is supervised by a responsible inspector. Any work that fails to pass the inspection cannot proceed until the inspector is able to verify its quality.
- 1. Incoming materials are inspected again upon entry into the plant.
- 2. Material markings will be transferred to all cut pieces to ensure identification and traceability.
- 3. Test pieces are used to ensure a higher success rate in welding.
- 4. Welded joints are subjected to heat treatment in accordance with operational procedures to relieve stress.
- 5. Pre-expansion is performed before the welding process begins.
- 6. Flaw detection is carried out before shipment.
- 7. Hydrostatic test examines the quality of complete boilers before delivery.